Educational ServicesTCO Issued
- Permit #
- 26-064509-CO
BuiltBefore › Arlington permits › 1124 W Arkansas Lane
14 building permits on record, from Apr 21, 2025 to Aug 31, 2026. Most recent: Educational Services on Aug 31, 2026.
Arlington coverage: The city publishes a rolling window, so work before September 2023 may be absent. Source: City of Arlington, Issued Permits.
Interior remodel to include MEPs 2021 I Codes / 2020 NEC Fire alarms/sprinklers/locking systems, signage, racking, retaining walls, paint booths, generators, fences, pools, irrigation and certificate of occupancy through separate permit.
DEMOLITION-AISD ANNEX 3 SPECIAL EDUCATION SERVICES BLDG. 2021 iCodes. It is the Contractors Responsibility to ensure All Services (Electric/Gas/Plumbing) are properly disconnected / turned off / capped off prior to beginning demolition. **FINAL INSPECTION IS REQUIRED** Lot must be clean and free of all debris at time of final inspection.
DEMOLITION-AISD ANNEX 1 ADMIN BLDG 2021 iCodes. It is the Contractors Responsibility to ensure All Services (Electric/Gas/Plumbing) are properly disconnected / turned off / capped off prior to beginning demolition. **FINAL INSPECTION IS REQUIRED** Lot must be clean and free of all debris at time of final inspection.
DEMOLITION-AISD ANNEX 3 RECORDS MGMT BLDG. 2021 iCodes. It is the Contractors Responsibility to ensure All Services (Electric/Gas/Plumbing) are properly disconnected / turned off / capped off prior to beginning demolition. **FINAL INSPECTION IS REQUIRED** Lot must be clean and free of all debris at time of final inspection.
DEMOLITION-AISD FUEL CANOPY 2021 iCodes. It is the Contractors Responsibility to ensure All Services (Electric/Gas/Plumbing) are properly disconnected / turned off / capped off prior to beginning demolition. **FINAL INSPECTION IS REQUIRED** Lot must be clean and free of all debris at time of final inspection.
DEMOLITION-AISD ANNEX 2 TRANSPORTATION AND TRAINING BLDG. 2021 iCodes. It is the Contractors Responsibility to ensure All Services (Electric/Gas/Plumbing) are properly disconnected / turned off / capped off prior to beginning demolition. **FINAL INSPECTION IS REQUIRED** Lot must be clean and free of all debris at time of final inspection.
DEMOLITION-AISD SPECIAL EDUCATION WAREHOUSE 2021 iCodes. It is the Contractors Responsibility to ensure All Services (Electric/Gas/Plumbing) are properly disconnected / turned off / capped off prior to beginning demolition. **FINAL INSPECTION IS REQUIRED** Lot must be clean and free of all debris at time of final inspection.
DEMOLITION-AISD TRANSPORTATION LOUNGE 2021 iCodes. It is the Contractors Responsibility to ensure All Services (Electric/Gas/Plumbing) are properly disconnected / turned off / capped off prior to beginning demolition. **FINAL INSPECTION IS REQUIRED** Lot must be clean and free of all debris at time of final inspection.
NEWC- AISD BUS CANOPY TO INCLUDE ELECTRICAL. 2021 iCodes/ 2020 NEC
Created by 2025 087014 000 00 CP Commercial Building Permit New utility building - To include electrical only 2021 I Codes / 2020 NEC Fire alarms/sprinklers/locking systems, signage, racking, retaining walls, paint booths, generators, fences, pools, irrigation, and certificate of occupancy through separate permit.
It is the Contractors Responsibility to ensure All Services (Electric/Gas/Plumbing) are properly disconnected / turned off / capped off prior to beginning demolition. **FINAL INSPECTION IS REQUIRED** Lot must be clean and free of all debris at time of final inspection.
DEMOLITION OF BUS BARN ONLY, NO M.E.P. It is the Contractors Responsibility to ensure all Services (Electric/Gas/Plumbing) are properly disconnected / turned off / capped off prior to beginning demolition. **FINAL INSPECTION IS REQUIRED** Lot must be clean and free of all debris at time of final inspection.
New Construction - IIB - B occ with storm shelter. ***DEFERRED ITEMS NOT PERMITTED TO BE CONSTRUCTED OR ON SITE UNTIL REVISION IS SUBMITTED, REVIEWED, AND APPROVED. ATTACHED CANOPY, ACCESS LADDERS, OPERABLE PARTITION, AND ALUMINIUM CURTAIN WALL SYSTEM.*** REV01 - Changes to storm shelter and generator/transformer enclosure. 2021 I Codes / 2020 NEC Fire alarms/sprinklers/locking systems, signage, racking, retaining walls, paint booths, generators, fences, pools, irrigation and certificate of occupancy through separate permit.