Other Services - except Public AdministrationTCO Issued
- Permit #
- 26-057021-CO
BuiltBefore › Arlington permits › 6000 Coping Ln
8 building permits on record, from Oct 31, 2025 to Sep 1, 2026. Most recent: Other Services - except Public Administration on Sep 1, 2026.
Arlington coverage: The city publishes a rolling window, so work before September 2023 may be absent. Source: City of Arlington, Issued Permits.
Retaining wall only 2021 I Codes Fire alarms/sprinklers/locking systems, signage, racking, retaining walls, paint booths, generators, fences, pools, irrigation, and certificate of occupancy through separate permit.
Paint booth only 2021 I Codes / 2020 NEC Fire alarms/sprinklers/locking systems, signage, racking, retaining walls, paint booths, generators, fences, pools, irrigation, and certificate of occupancy through separate permit.
Tesla Collision Center 2021 I-Codes / 2020 NEC Construction of new collision center for Tesla, Inc. To include MEP. *Paint booth installation will require a separate permit submittal and review. *Fire Protection Systems require a separate fire permit submittal and review; each system requires a separate permit. (Fire Sprinkler, Fire Alarm, Access Control)
Get an alert when a new permit is filed at 6000 Coping Ln. Alerts open with early access.