FoundationIssued
2021 IRC Foundation Repair only **Must Call for a Final Inspection** Stamped engineer letter required at final inspection.
- Permit #
- 26-071216-RP
- Reported value
- $17,011
BuiltBefore › Arlington permits › 2607 Cedar View Drive
2 building permits on record, from Jul 17, 2024 to Sep 1, 2026. Most recent: Foundation on Sep 1, 2026.
Arlington coverage: The city publishes a rolling window, so work before September 2023 may be absent. Source: City of Arlington, Issued Permits.
2021 IRC Foundation Repair only **Must Call for a Final Inspection** Stamped engineer letter required at final inspection.
Get an alert when a new permit is filed at 2607 Cedar View Drive. Alerts open with early access.