New constructionIssued
- Permit #
- 26-066460-SI
- Reported value
- $3,500
BuiltBefore › Arlington permits › 500 E Division Street
16 building permits on record, from Sep 28, 2023 to Aug 31, 2026. Most recent: New construction on Aug 31, 2026.
Arlington coverage: The city publishes a rolling window, so work before September 2023 may be absent. Source: City of Arlington, Issued Permits.
RMDL-CINC5 TACOS TO INCLUDE ELECTRICAL ONLY. 2021 iCodes/ 2020 NEC *The following require separate permits: Fire Alarm, Fire Suppression, Fire Sprinkler, Access Control/Panic Hardware, Signs, Fence and associated gates, Irrigation, Dumpster Enclosures, Awnings, Patio Covers, Shade Structures and Certificate of Occupancy.*
The issuance of this CO is granted for operation and occupancy of the reflected building only. Occupancy of other structures or spaces on-site is not permitted.
The issuance of this CO is granted for operation and occupancy of the reflected building only. Occupancy of other structures or spaces on-site is not permitted.
Interior remodel - to include MEPs adding a kitchen 2021 I Codes / 2020 NEC Fire alarms/sprinklers/locking systems, signage, racking, retaining walls, paint booths, generators, fences, pools, irrigation and certificate of occupancy through separate permit.
Added outdoor seating area 2021 I Codes / 2020 NEC Fire alarms/sprinklers/locking systems, signage, racking, retaining walls, paint booths, generators, fences, pools, irrigation and certificate of occupancy through separate permit.
The issuance of this CO is granted for operation and occupancy of the reflected building only. Occupancy of other structures or spaces on-site is not permitted.