New constructionIssued
- Permit #
- 26-006263-SW
- Reported value
- $500,000
BuiltBefore › Arlington permits › 1300 Ballpark Way
10 building permits on record, from Aug 6, 2024 to Aug 31, 2026. Most recent: New construction on Aug 31, 2026.
Arlington coverage: The city publishes a rolling window, so work before September 2023 may be absent. Source: City of Arlington, Issued Permits.
It is the Contractors Responsibility to ensure All Services (Electric/Gas/Plumbing) are properly disconnected / turned off / capped off prior to beginning demolition. **FINAL INSPECTION IS REQUIRED** Lot must be clean and free of all debris at time of final inspection.
Loews Arlington III 2021 I-Codes / 2020 NEC New construction type I-A hotel, 22 stories above grade(23 occupiable levels), 507 guest rooms. To include MEP. *NO FINAL INSPECTION TO BE GRANTED UNTIL THE FOLLOWING EFERRED SUBMITTALS ARE REVIEWED AND APPROVED BY CITY OF ARLINGTON: COLD FORMED METAL FRAMING, PRE-FAB STAIRS AND RAILINGS, METAL GRATINGS, ORNAMENTAL METALS, FIRESTOPPING, GLAZED ALUMINUM FRAMING, BLDG MAINTENANCE EQUIPMENT, ELECTRONIC TRACTION ELEVATORS, OPERABLE PARTITIONS, VENTED KITCHEN HOODS.*
The issuance of this CO is granted for operation and occupancy of the reflected building only. Occupancy of other structures or spaces on-site is not permitted.
Structural canopy only - No MEPs 2021 I Codes Fire alarms/sprinklers/locking systems, signage, racking, retaining walls, paint booths, generators, fences, pools, irrigation, and certificate of occupancy through separate permit.
Highest floor canopies - No MEPs 2021 I Codes Fire alarms/sprinklers/locking systems, signage, racking, retaining walls, paint booths, generators, fences, pools, irrigation, and certificate of occupancy through separate permit.
2021-I Codes & 2020 NEC Permit is limited to the open parking garage structure. Deferred submittals not submitted for review at the time of the initial permit application must be submitted for review and approval before installation. Deferred submittals: - Metal stairs - Precast structural elements - Topping slab structural design Conditions: ** The approval of the building permit is limited to the building listed on the permit it does not represent approval of any fire sprinkler system, fencing, site work, access controls, fire alarm system, or signage. A separate permit is required . ** Plan review in no way excludes items that may be found in the field during inspections and be required to be completed to comply with applicable codes and ordinances.
2021 IBC / 2020 NEC **Concrete Foundation & Under Slab MEP Permit Only. ** This permit is phased construction and approval of the foundation does not waive any other building code requirement. ** Plan review in no way excludes items that may be found in the field during inspections and be required to be completed to comply with applicable codes and ordinances. ** The approval of the building permit does not represent approval of any fire sprinkler system, and/or fire alarm system. A separate permit is required for the sprinkler system, and/or the alarm system.
Get an alert when a new permit is filed at 1300 Ballpark Way. Alerts open with early access.